Hello, all.
I can't believe we are now at the final week of instruction! We meet tomorrow in B91 for the last of our Drift 3 screenings. Attendance is mandatory, even if you've already screened your work.
We have also been asked by the Film Department to make sure that as many of you complete the course evaluations as possible, so, please, please, please, if you didn't fill out a course eval last week, show up tomorrow and help us out with that. It's really important.
Drift Maps are due tomorrow at 3 PM, so make sure you've documented all three of your Drifts.
On Wednesday in B91 we will have our final class meeting, a potluck and screening of Rivers and Tides: Andy Goldsworthy Working With Time. This should be a fun and relaxing way to end the semester, so think of something yummy to eat and share.
See you tomorrow.
Sunday, May 4, 2008
Drift 3 Screenings, Course Evals, Drift Maps Due
Posted by Glenn Bach at 8:16 PM 0 comments
Labels: Drift 3, Drift Map, Screenings, Spring 2008
Tuesday, April 29, 2008
Drift 3 Screenings, Round 2
Hello, all.
We meet tomorrow in B91 for the second round of final screenings. Attendance is mandatory, even for those whose videos were shown on Monday.
Tomorrow is also the deadline to turn in your production kits. Do so by 3 PM.
We'll see you all tomorrow.
Posted by Glenn Bach at 5:59 PM 0 comments
Labels: Drift 3, Production Kits, Spring 2008
Sunday, April 27, 2008
Drift 3 Screenings, Production Kits due
Hello, all.
We meet tomorrow in MUS 180 for the first round of Drift 3 screenings. We will be selecting sound videos at random, so make sure your Drift 3 blogs are posted and finished by 3 PM. Attendance is mandatory.
Check the grading criteria for Drift 3 here:
http://www.glennbach.com/film_116/drift_3_grading_criteria.pdf
You must turn in your Production Kits by this Wednesday, April 30, 3 PM, to the Equipment Room. Please don't be late on this. You will be docked 10 points from your Participation grade for every day the kit is late. If the Equipment Room does not receive your kit by the end of the semester, you will receive a 0 on your Drift 3 grade, the Film Department will put a hold on your records, you will be billed for the cost of replacing the kit, and you will be forbidden from checking out equipment in the future.
Looking forward to screening your work!
Posted by Glenn Bach at 7:10 PM 0 comments
Labels: Drift 3, Production Kits, Spring 2008
Monday, April 14, 2008
Drift 3 Structure, Individual Critiques
Hello, all.
We saw a few of you during the Help Sessions, and we hope the rest of you are making good progress on your Drift 3 blogs. A reminder that your Drift 3 videos must be the end result of a process that begins with a careful reflection on your previous Drift experiences, as illustrated in your Drift Assessments, Ten Questions, and Production Strategy. This process is important in order to strengthen the connections between all the work you make in the class, and to gain a better understanding of the relationship you have with your work.
The structure of your Drift 3 blogs is covered on the Drift 3 page:
http://www.glennbach.com/film_116/08116_drift03.html
When I left campus this afternoon, there were still plenty of slots available for the Individual Critique sessions with your Lab Instructors. Remember that this is a required appointment, so sign up by Wednesday at 3 if you haven't done so already.
Posted by Glenn Bach at 9:14 PM 0 comments
Labels: Drift 3, Individual Critiques, reminder
Sunday, April 13, 2008
Final Drift 3 Help Session
Hello, all.
Tomorrow is the final Open Lab Help Session for Drift 3. Here is the schedule:
B-18, Steve, Lilly, and David
B-56, Seth, Julie, Alex, Glenn
We will be available to help you troubleshoot technical issues or to give you feedback on your work in progress.
Individual Critiques begin on Wednesday, April 16, and the sign-up sheets are on my office door, B60. Sign up by 3 PM on the 16th (first-come, first-served).
Best of luck with your editing, and we'll see you tomorrow.
Posted by Glenn Bach at 4:17 PM 0 comments
Labels: Drift 3, Help Session, Spring 2008
Wednesday, April 9, 2008
Individual Critiques: Sign Up Sheets
Hello, all.
The Individual Critiques are scheduled for April 16, 21, and 23. The sign-up sheets are posted on my office door (B60), and slots are first-come first-served. You must see your Lab Instructor on one of these days at one of the designated times; any alternative arrangement must be made with your Lab Instructor.
Remember that we are having open lab help sessions today and Monday, April 14.
Posted by Glenn Bach at 3:06 PM 0 comments
Labels: Drift 3, Individual Critiques, Spring 2008
Tuesday, April 8, 2008
Open Lab Help Sessions, Wednesday, April 9
Hello, all.
The Reflective Responses are trickling in, and I hope to see more come through tomorrow before 3 PM.
http://tinyurl.com/3oomz5
Tomorrow is the first of two open lab help sessions for Drift 3, so we'd love to see you all there for help with troubleshooting or to get some feedback on your work in progress. Here is the schedule:
B-18: Steve, Lilly, and David
B-56: Seth, Julie, and Alex
B-65: Glenn
See you tomorrow.
Posted by Glenn Bach at 11:18 PM 0 comments
Labels: Drift 3, Help Session, Reflective Response, Spring 2008
Sunday, April 6, 2008
Research Screenings, April 7, B91
Hello, all.
I hope that you all had a great Spring weekend, and that your Drift 3 walks were productive.
We meet tomorrow, Monday, April 7, in B91 for a series of screenings we hope will further illuminate some of the image and sound strategies we have been discussing in class.
The Reflective Response #4 (Screenings) is due Wednesday, April 9, 3 PM.
http://tinyurl.com/3oomz5
See you all tomorrow.
Posted by Glenn Bach at 10:17 PM 0 comments
Labels: Drift 3, Reflective Response, Spring 2008
Tuesday, April 1, 2008
Image/Sound Lecture, Wednesday, April 2, B91
Hello, all.
We could not get the VCR to work in MUS 180, so we will meet tomorrow in B91 instead. Lilly will demo and lecture on various image/sound relationships to consider when you are editing your Drift 3 sound videos, and she will also show examples of interesting image/sound solutions. This is a key lecture, and not one to be missed.
Also, it looks as if we may (finally!) have some spring-like weather this weekend, so it's a good idea to get out on your Drift 3 walks sooner rather than later. You never know if/when a glitch or two will pop up, so it's better to have plenty of material early in the game than to scramble at the last minute.
See you all tomorrow.
Posted by Glenn Bach at 7:56 PM 0 comments
Labels: Drift 3, Spring 2008