Hello, all.
This is it. The final class meeting of the semester. We meet tomorrow in B18 for a screening of "Rivers and Tides: Andy Goldsworthy Working With Time," a very inspiring documentary on Goldsworthy and his process. I love this film, and it changed how I thought about my work and life as an artist, particularly how failure (and patience!) should be considered a natural part of the creative process.
Tomorrow is a potluck, as well, so bring something yummy to eat or drink. We'll start the film right at 3, so we should be done by 4:30.
See everyone tomorrow.
Tuesday, May 6, 2008
Final Class Meeting!
Posted by Glenn Bach at 9:59 PM 0 comments
Labels: Spring 2008
Sunday, May 4, 2008
Drift 3 Screenings, Course Evals, Drift Maps Due
Hello, all.
I can't believe we are now at the final week of instruction! We meet tomorrow in B91 for the last of our Drift 3 screenings. Attendance is mandatory, even if you've already screened your work.
We have also been asked by the Film Department to make sure that as many of you complete the course evaluations as possible, so, please, please, please, if you didn't fill out a course eval last week, show up tomorrow and help us out with that. It's really important.
Drift Maps are due tomorrow at 3 PM, so make sure you've documented all three of your Drifts.
On Wednesday in B91 we will have our final class meeting, a potluck and screening of Rivers and Tides: Andy Goldsworthy Working With Time. This should be a fun and relaxing way to end the semester, so think of something yummy to eat and share.
See you tomorrow.
Posted by Glenn Bach at 8:16 PM 0 comments
Labels: Drift 3, Drift Map, Screenings, Spring 2008
Tuesday, April 29, 2008
Drift 3 Screenings, Round 2
Hello, all.
We meet tomorrow in B91 for the second round of final screenings. Attendance is mandatory, even for those whose videos were shown on Monday.
Tomorrow is also the deadline to turn in your production kits. Do so by 3 PM.
We'll see you all tomorrow.
Posted by Glenn Bach at 5:59 PM 0 comments
Labels: Drift 3, Production Kits, Spring 2008
Sunday, April 27, 2008
Drift 3 Screenings, Production Kits due
Hello, all.
We meet tomorrow in MUS 180 for the first round of Drift 3 screenings. We will be selecting sound videos at random, so make sure your Drift 3 blogs are posted and finished by 3 PM. Attendance is mandatory.
Check the grading criteria for Drift 3 here:
http://www.glennbach.com/film_116/drift_3_grading_criteria.pdf
You must turn in your Production Kits by this Wednesday, April 30, 3 PM, to the Equipment Room. Please don't be late on this. You will be docked 10 points from your Participation grade for every day the kit is late. If the Equipment Room does not receive your kit by the end of the semester, you will receive a 0 on your Drift 3 grade, the Film Department will put a hold on your records, you will be billed for the cost of replacing the kit, and you will be forbidden from checking out equipment in the future.
Looking forward to screening your work!
Posted by Glenn Bach at 7:10 PM 0 comments
Labels: Drift 3, Production Kits, Spring 2008
Monday, April 21, 2008
Individual Critiques, Drift Maps
Hello, all.
We continue today with Individual Critiques. If you haven't signed up for an appointment with your Lab Instructor, do so right away. The sign-up sheets are on my door, B60. These sessions are critical for you to receive feedback on your work-in-progress before we begin officially screening your final sound videos on Monday, April 28th. Please check the Drift 3 grading criteria to make sure you are hitting all the necessary marks.
http://www.glennbach.com/film_116/drift_3_grading_criteria.pdf
A reminder that the Drift Maps are a graded feature of this course (50 points), and that your GoogleMap must include documentation of all three of your Drifts. I've been going through the Drift Maps throughout the semester, and I thought I'd point out some things to look for when fine-tuning your Drift Maps:
Jonathan L. and Dave M. color coded their Drifts.
http://tinyurl.com/yvk3q2
http://tinyurl.com/32b2oy
Jordan S. included descriptive Drift experiences on various placemarks, and included links to the MP3s.
http://tinyurl.com/yssnbg
Justin T. used looser, thicker lines that look hand-drawn and give his Drift Map a lighter feel; his description of steps he had to take to faithfully execute his Drift Strategy made me think that I should remind you all not to risk your lives for your Drifts!
http://tinyurl.com/2ofhkd
Andy S. included his Drift Strategy in the placemark description for his Starting Point.
http://tinyurl.com/yqpbxc
William O. and Michael C. both inscribed shapes on the map according to their Drift Strategies (although I wish Michael had chosen larger areas to explore!).
http://tinyurl.com/yupdw6
http://tinyurl.com/2ubr9s
The Drift Maps are due Monday, May 5, so you still have some time to fill in some blanks. You can review the Drift Map grading criteria here:
http://www.glennbach.com/film_116/drift_map_criteria.pdf
Okay, we'll hopefully see you soon.
Posted by Glenn Bach at 9:53 AM 0 comments
Labels: Drift Map, Individual Critiques, Spring 2008
Monday, April 14, 2008
Drift 3 Structure, Individual Critiques
Hello, all.
We saw a few of you during the Help Sessions, and we hope the rest of you are making good progress on your Drift 3 blogs. A reminder that your Drift 3 videos must be the end result of a process that begins with a careful reflection on your previous Drift experiences, as illustrated in your Drift Assessments, Ten Questions, and Production Strategy. This process is important in order to strengthen the connections between all the work you make in the class, and to gain a better understanding of the relationship you have with your work.
The structure of your Drift 3 blogs is covered on the Drift 3 page:
http://www.glennbach.com/film_116/08116_drift03.html
When I left campus this afternoon, there were still plenty of slots available for the Individual Critique sessions with your Lab Instructors. Remember that this is a required appointment, so sign up by Wednesday at 3 if you haven't done so already.
Posted by Glenn Bach at 9:14 PM 0 comments
Labels: Drift 3, Individual Critiques, reminder
Sunday, April 13, 2008
Final Drift 3 Help Session
Hello, all.
Tomorrow is the final Open Lab Help Session for Drift 3. Here is the schedule:
B-18, Steve, Lilly, and David
B-56, Seth, Julie, Alex, Glenn
We will be available to help you troubleshoot technical issues or to give you feedback on your work in progress.
Individual Critiques begin on Wednesday, April 16, and the sign-up sheets are on my office door, B60. Sign up by 3 PM on the 16th (first-come, first-served).
Best of luck with your editing, and we'll see you tomorrow.
Posted by Glenn Bach at 4:17 PM 0 comments
Labels: Drift 3, Help Session, Spring 2008